Skip to content

Gallery

What the work looks like

Real before-and-after pairs, the kinds of building I work in, and a full set of photographs from my recent jobs.

  • Not finished until it passes the handover inspection
  • On site since 2011
Clean white doors in a finished apartment

Before and after

The same spot, before the work and after it

Two real examples of my own — the exact same surface, photographed before I started and after handover.

BeforeA stained timber deck before cleaning
AfterThe same timber deck after cleaning, clean and glossy
A timber terrace — a stained deck brought back to a gloss
BeforeA grimy, dust-covered window track before cleaning
AfterThe same window after cleaning, with a sea view beyond
A window and its track — from dust and building residue to clean glass
BeforeAn open electrical panel in a marble wall, covered in construction dust — before cleaning
AfterThe same electrical panel after cleaning, the breakers wiped clean
An electrical panel — from construction dust to clean breakers

The kinds of building I work in

Washing a tiled floor after construction, water and a bucket on the floor

A building at the end of construction

Shell complete, finishing done, and a handover fixed to a date.

Handover cleaning
Safee washing a glass door in a finished apartment

An office floor

Raised floors, acoustic ceilings and a great deal of internal glazing.

Office & commercial
A corridor with dark stone-look tiles, cleaned after construction

A residential building

Flats before handover, the lobby, stairwells and car park.

Residential

More photos

A closer look at recent jobs

Finished handovers, close-up details and the equipment I bring — from sea-front apartments and towers.

Every photo is from my own jobs along the coast. Tap any photo to open it full size.

Want to see what this looks like on your project?

Send a few photographs from site and the floor area, and I will come back with an accurate quote.