Skip to content

Gallery

What the work looks like

Two states and three kinds of building. These photographs illustrate the kind of work — they are not presented as “before and after” pairs of the same project.

  • Not finished until it passes the handover inspection
  • On site since 2011
Keys handed over at the end of a cleaning job

When I arrive

Plasterboard dust settled on every surface, leftover materials in the corners and light debris on every floor.

A newly built flat straight after the trades left, with plaster residue and dust across the floorA stairwell in a new building covered in dust and light construction debrisAn open floor before cleaning, with tools and leftover materials

When I hand over

Floors polished, glass clear, tracks and joints clean, and a building ready for residents.

A finished room ready for handover, floor polished and windows clearA clean stairwell after a thorough cleanA new kitchen, clean and ready for residents

Illustrative photographs — not pairs of the same building.

The kinds of building I work in

A finished building shell before cleaning work begins

A building at the end of construction

Shell complete, finishing done, and a handover fixed to a date.

Handover cleaning
A worker vacuuming an office floor before occupancy

An office floor

Raised floors, acoustic ceilings and a great deal of internal glazing.

Office & commercial
An empty, clean building lobby before occupancy

A residential building

Flats before handover, the lobby, stairwells and car park.

Residential

Want to see what this looks like on your project?

Send a few photographs from site and the floor area, and I will come back with an accurate quote.